In Tittling, Bavaria, we successfully realized a modern battery storage system for our customer. As the responsible Full EPC partner, we accompanied the project from the initial construction measures to the final commissioning and grid connection.
Precise Implementation of our Utility Scale Storage Project
For the battery storage project in Tittling, we assumed full EPC responsibility, from the initial civil engineering work to the final IT and communication infrastructure. The energy storage system with 10 MW power and 20 MWh capacity was successfully integrated and commissioned at the 20 kV grid level.
All technical components were precisely assembled, professionally connected, and fully tested. Thanks to the holistic project management from a single source, the storage system could be connected to the grid on schedule and optimized for ongoing operation.
94104 Tittling, Bavaria
Year of construction: 2025 Customer: terralayr
Facts and figures
All facts about the project
Here you will find all the important information on technical specifications, system structure, fields of application and the performance we provide, as well as other exciting facts and figures about the project.
Full EPC
Civil engineering work
IT infrastructure
Installation of technical components
Grid connection
Ongoing: O&M (Operation and Maintenance)
Battery storage: TrinaStorage
Inverter: 3 x 4.39 MVA
3 x MV-Skid
Power: 10 MW
Capacity: 20 MWh
Grid level: 20 kV
Products and Services
Sustainable solutions for intelligent energy use
We are committed to innovative solutions that bring about a groundbreaking change in the production, storage and use of energy.
We are experts in industrial and Utility Scale storage solutions. As a manufacturer-independent provider, we offer efficient and individual battery storage solutions for your needs – all from a single source!
Intelligent, self-sufficient, networked - our okean energy management system controls your energy flow in Multi-Use Case operation. You have everything in view on one user interface.