The ongoing discussions surrounding the EEG and the Grid Package will significantly shape the framework conditions for battery storage in Germany in the coming years. In a recent article by energate, our Managing Director Dr. Magnus Pielke, among others, explains why the right regulatory course must be set now—particularly regarding issues such as co-location, grid-neutral grid connections, system-supporting connection capacity (SAL), Flexible Connection Agreements (FCA), and the structure of construction cost subsidies and storage grid fees.
Whether and how quickly battery storage capacity can be expanded in Germany depends increasingly on specific regulatory details. Issues that at first glance seem technical and minor are, in practice, decisive in determining whether a storage project is economically viable:
From our perspective, the key point is this: The EEG and the Grid Package must not merely “take battery storage into account”—they must consistently reflect its systemic impact in the regulatory framework. Battery storage increases the flexibility of the energy system, enables the integration of larger amounts of renewable energy, and can significantly reduce the load on power grids. This effect should also be reflected in the design of grid connections, grid fees, and subsidy frameworks, rather than treating storage systems the same way as traditional generation or consumption facilities under regulatory rules.
To ensure that projects remain predictable and economically viable, the industry now needs clear, reliable, and practical rules—both for grid connection procedures and for the financial arrangements governing connection and grid use.
You can find the full article, including Dr. Magnus Pielke’s analysis, on energate.
Here is the link.
Just one click away from your non-binding initial consultation
Our team will be happy to assist you with all aspects of sustainable energy management, battery storage, and more.
"*" indicates required fields
Download with just 1 click:
"*" indicates required fields