{"id":9085,"date":"2025-03-12T13:45:00","date_gmt":"2025-03-12T12:45:00","guid":{"rendered":"https:\/\/be-storaged.de\/dirkshof-launches-40-mwh-battery-project-in-northern-germany\/"},"modified":"2026-02-09T12:21:41","modified_gmt":"2026-02-09T11:21:41","slug":"dirkshof-launches-40-mwh-battery-project-in-northern-germany","status":"publish","type":"post","link":"https:\/\/be-storaged.de\/en\/blog\/dirkshof-launches-40-mwh-battery-project-in-northern-germany\/","title":{"rendered":"Dirkshof launches 40 MWh battery project in Northern Germany"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Dirkshof launches 40 MWh battery project in Northern Germany<\/h2>\n\n<p>In February 2025, be.storaged began construction of a battery storage system with a capacity of 40 MWh \/ 20 MW for the wind energy company Dirkshof in Schleswig-Holstein. <\/p>\n\n<p>The project is being handled entirely by be.storaged as an EPC and is scheduled for completion by the end of the year. The system will enable Dirkshof to participate in multi-market trading, increase its operational flexibility, and unlock new revenue streams in the energy markets.  <\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/be-storaged.de\/wp-content\/uploads\/2025\/11\/UW-Luftbild_Dirkshoff-1024x768.jpg\" alt=\"\" class=\"wp-image-7145\" srcset=\"https:\/\/be-storaged.de\/wp-content\/uploads\/2025\/11\/UW-Luftbild_Dirkshoff-1024x768.jpg 1024w, https:\/\/be-storaged.de\/wp-content\/uploads\/2025\/11\/UW-Luftbild_Dirkshoff-300x225.jpg 300w, https:\/\/be-storaged.de\/wp-content\/uploads\/2025\/11\/UW-Luftbild_Dirkshoff-768x576.jpg 768w, https:\/\/be-storaged.de\/wp-content\/uploads\/2025\/11\/UW-Luftbild_Dirkshoff-1536x1152.jpg 1536w, https:\/\/be-storaged.de\/wp-content\/uploads\/2025\/11\/UW-Luftbild_Dirkshoff-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dirkshof launches 40 MWh battery project in Northern Germany In February 2025, be.storaged began construction of a battery storage system with a capacity of 40 MWh \/ 20 MW for the wind energy company Dirkshof in Schleswig-Holstein. The project is being handled entirely by be.storaged as an EPC and is scheduled for completion by the [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":9086,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_links_to":"","_links_to_type":0,"footnotes":""},"categories":[101],"tags":[],"class_list":["post-9085","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/posts\/9085","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/comments?post=9085"}],"version-history":[{"count":3,"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/posts\/9085\/revisions"}],"predecessor-version":[{"id":9276,"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/posts\/9085\/revisions\/9276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/media\/9086"}],"wp:attachment":[{"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/media?parent=9085"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/categories?post=9085"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/be-storaged.de\/en\/wp-json\/wp\/v2\/tags?post=9085"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}